Quality assurance
Nine checkpoints between the log and the container.
Testing is not a final gate here — it runs alongside production, so problems are corrected while the batch is still on the line.
- Raw material inspection and selection
- Moisture control at every process
- PF & MUF glue spread monitoring
- Hot press parameters strictly controlled
- Calibration for uniform thickness
- Bonding tests as per EN 314
- Mechanical tests as per EN 310
- Formaldehyde emission tests as per EN 717
- Final visual inspection and packing
Bending tests
Final inspection
Let’s talk volumes
Tell us your sizes, grades and destination port.
We quote on full container loads to any port worldwide, with mill test certificates and certification documentation supplied on request.